EMSEAL Joint Systems Ltd. Revenue and Competitors

Boston, MA USA

Location

N/A

Total Funding

Construction

Industry

Estimated Revenue & Valuation

  • EMSEAL Joint Systems Ltd.'s estimated annual revenue is currently $39.4M per year.(i)
  • EMSEAL Joint Systems Ltd.'s estimated revenue per employee is $290,000

Employee Data

  • EMSEAL Joint Systems Ltd. has 136 Employees.(i)
  • EMSEAL Joint Systems Ltd. grew their employee count by 7% last year.

EMSEAL Joint Systems Ltd.'s People

NameTitleEmail/Phone
1
VPReveal Email/Phone
2
ControllerReveal Email/Phone
3
VP - SalesReveal Email/Phone
4
Director Business DevelopmentReveal Email/Phone
5
Director EngineeringReveal Email/Phone
6
Director, Canadian OperationsReveal Email/Phone
7
Director Strategic Projects & Key AccountsReveal Email/Phone
8
Regional Manager, Middle Atlantic Emseal Joint SYReveal Email/Phone
9
Southeast Regional ManagerReveal Email/Phone
10
Bridge & Highway Midwest Territory ManagerReveal Email/Phone
Competitor NameRevenueNumber of EmployeesEmployee GrowthTotal FundingValuation
#1
$4.7M23-26%N/AN/A
#2
$8.1M35-8%N/AN/A
#3
$58.1M182-2%N/AN/A
#4
$27.6M959%N/AN/A
#5
$1358.5M33463%N/AN/A
#6
$7.2M317%N/AN/A
#7
$0.7M5-17%N/AN/A
#8
$30.7M10614%N/AN/A
#9
$26.7M927%N/AN/A
#10
$5.7M280%N/AN/A
Add Company

What Is EMSEAL Joint Systems Ltd.?

While EMSEAL prides itself on having high-quality, innovative and durable materials for use in sealing and bridging small and large, building component and structural joints in foundations, decks, walls, and floors, the company's track record of successfully completed projects is equally attributable to its approach to expansion joint treatment: Anybody can make an expansion joint appear watertight in cross-section. However, joints leak at changes in plane, direction and where dissimilar joint materials meet. Successful projects with expansion joints that don't leak are characterized by a collaborative commitment by the A/E team, the general contractor, the joint manufacturer, and the waterproofing sub-contractor to detail, construct, fabricate, and install three-dimensional solutions. The process begins at design with the visualization by the A/E team and the joint manufacturer of expansion joint locations, layout and impact on all other adjacent materials and spaces. This visualization is aided by the use of simple isometric line sketches of joint layouts which reveal conditions that could be designed-out, simplified, or for which details must be developed. The A/E then supplements the usual cross-sections with axonometric details of conditions involving changes in plane, direction and between dissimilar materials. To these conditions, the expansion joint manufacturer must furnish axonometric CAD details showing their materials adaptation to these conditions. The manufacturer's application of their material to the designed conditions should be warrantable as watertight at all agreed upon changes in plane, direction, and intersection between various joint materials. The final isometric layout(s) and all cross-section and axonometric details then become part of the bid documents and working drawings. Before and during construction the general contractors' role is to elevate the place the expansion joints typically occupy in the sequencing path. ALL trades must be held accountable for their work in relation to expansion joints. The joints, for example, must be protected from construction traffic damage and cannot become a place to accumulate construction tolerances. The expansion joint subcontractor must commit to taking field measurements from which the manufacturer can fabricate and furnish factory-welded, warranted assemblies to install into the relevant joint locations. This collaborative approach is not just theory. It is a practice that has resulted in the successful execution of watertight expansion joints on new and retrofit projects on structures of every type. From the National Naval Medical Center in Bethesda, to the enormous, newly constructed mixed-use development- Atlantic Station in Atlanta, to the retrofit of FedEx Field Washington Redskins Stadium, and the newly constructed Citizens Bank Philadelphia Phillies Ballpark, owners, A/E's, general contactors, EMSEAL, and a select group of like-minded waterproofing sub-contractors are proving this approach possible and practical. If this collaborative and disciplined approach is not adopted as the basic philosophy on any project of any scope, whether a stadium, hospital, school, government building or airport, it can be expected that leaks at expansion joints will constitute a high percentage of post tenancy headaches. We invite you to make EMSEAL your partner in success on your expansion joint project: 1-800-526-8365 or techinfo@emseal.com

keywords:N/A

N/A

Total Funding

136

Number of Employees

$39.4M

Revenue (est)

7%

Employee Growth %

N/A

Valuation

N/A

Accelerator

Company NameRevenueNumber of EmployeesEmployee GrowthTotal Funding
#1
$34.6M1436%N/A
#2
$34.8M14427%N/A
#3
$26.2M164-8%N/A
#4
$7.5M16520%N/A
#5
$300M1703%$185.3M